Pompey Centre Installation Case StudyCompared to the installation of the more traditional forms of accent lighting e.g. Florescent, Cold Cathode and Neon, Snap-N-Light provides a quick and simple solution that is aesthetically pleasing even when switched off coupled with an extremely low running cost. Extreme Green Series Light Tape® has an extended life of 40,000 hours and consumes less than 1 Watt of electricity per meter at 1” wide. Using No Gas, No Glass or Heavy Metals it is the perfect solution for Architectural projects and Health and Safety applications. ![]() However, as scaffolding was not erected all the way around the Pompey Centre, specially extended 90 degree angled brackets were used for ease of instillation and fitted around the sides and back of the building at set intervals. These were screwed on to the top horizontal surface of the edge of the roof so providing fixings on all sides ready for the Snap and Light product to be easily fixed in to place. ![]()
The Light Tape® fixing brackets used in this project were made out of Fiberglass with a polycarbonate front. They were placed every 5m on the run interspaced with ElecroluminX mounting clips every 300mm. once the clips were fitted the final part of the Snap-N-Light, Light Tape® system, could be easily clipped in to place around the top of the building and then connected to the mains electrical supply via a SD8000 Smart Driver™ power supply unit also supplied by Light Tape UK and controlled by a light sensitive photo cell. ![]() |
|
|
|
Based in Barnsley South Yorkshire Light Tape UK Limited is the exclusive distributor for Electro-LuminX products in the UK and Ireland. |
|
Light Tape and its wide range of uses www.lighttape.co.uk |
|
Phone Light Tape UK: +44 (0)8456 170 697 or +44 (0)7899 790 669 Email Light Tape UK: info@lighttape.co.uk |
|